This project started in 2008 with planning and preparation, the customer contacted us in regards to a kitchen upgrade, one year later it had snowballed into a complete 1st floor modern conversion.  We spent many hours working with the customer, planning, designing and budgeting for this project.  Work did not start until October 2010, was completed until January 2011.

Due to the size of this project and the fact that it covered the entire 1st floor we had to break it up into sections; this way it did not overwhelm the customer all at once.  Demo in a living place can cause a lot of dust problems, so rooms were closed off and ventilation was needed.

phone

Project Overview:

Demoed all kitchen cabinets, 2 main walls dividing kitchen from dining room and living room from den.  This opened up the house, and gave it a more modern feel.

Custom designed kitchen layout to customer’s satisfaction.  This required moving of kitchen sink and all appliances, upgrade in electrical to meet cabinet and appliance relocation.  Custom granite counter tops and back splash.

Repair of all hard wood to match existing, replacement of all interior doors, install of custom bamboo flooring for study, install of 2 custom beams with custom columns and custom trim to match.  Install of custom entertainment system to match kitchen cabinets complete with wine racks.

Resurface of fire place, repair and replace crown molding and base board, textured walls and repainting of entire 1st floor.  Electrical up grade throughout 1st floor, new switches light fixtures and receptacles.

Level of difficulty is – 10 out of 10

A project like this takes skills on all levels to plan and see through to completion.

Whether you need a major renovation or a small upgrade – give us a call today:

phone

Project in Process: